Where the work is

Active and planned data center construction across the US, organized as deployment targets instead of generic map pins.

Projects tracked

56

Estimated jobs

~116,800

States

15

Filter deployment targets

Showing 56 of 56 projects

AZ

6 projects

Deployment site

Elliot Road Technology Corridor Campus

Mesa, AZ

Under Construction

Capacity

450 MW

Workforce

~3,000 jobs

Developer
EdgeCore Digital Infrastructure
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2024-2026

450 MW hyperscale campus on 43.87 acres in Mesa's Elliot Road Tech Corridor. 206 MW operational, 250+ MW expansion under construction. Powered by Salt River Project.

Deployment site

Redhawk Mesa Data Center

Mesa, AZ

Under Construction

Capacity

400 MW

Workforce

~2,500 jobs

Developer
Google
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2023-2027

$600M+ multi-phase campus on 187 acres. Phase 1 operational (July 2025, 288K sq ft). Phase 2 (400 MW, 280K sq ft) under construction for 2027. Phase 3 in design. Powered by solar and wind.

Deployment site

Meta Mesa Data Center

Mesa, AZ

Under Construction

Capacity

200 MW

Workforce

~1,500 jobs

Developer
Meta
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, Ironworker, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2023-2026

$1B data center campus built by DPR Construction. 2.5M sq ft using 12,000 tons of steel. Expected completion 2026.

Deployment site

PHX-13 Glendale Campus

Glendale, AZ

Under Construction

Capacity

72 MW

Workforce

~600 jobs

Developer
Aligned Data Centers
Trades
Electrician, HVAC Tech, Cable Puller, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2025-2027

72 MW facility on 100 acres. First of 4 planned facilities on Glendale campus. Uses Delta³ air cooling. Power from APS via new 230 kV transmission line. Groundbreaking April 2025.

Deployment site

AZP-3 Phoenix

Phoenix, AZ

Under Construction

Capacity

36 MW

Workforce

~300 jobs

Developer
Iron Mountain
Trades
Electrician, HVAC Tech, Cable Puller, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2025-2026

36 MW data center on East Roosevelt St. Part of Iron Mountain's 39-acre Phoenix campus. Expected completion May 2026.

Deployment site

PHX Campus

Goodyear, AZ

Under Construction

Capacity

100 MW

Workforce

~800 jobs

Developer
Stream Data Centers
Trades
Electrician, HVAC Tech, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2024-2026

Multi-building campus in Greater Phoenix metro. PHX I fully leased, PHX II commissioning 2025. Largest data center campus in the region.

CA

1 project

Deployment site

Prime Sacramento Campus

Sacramento, CA

Under Construction

Capacity

50 MW

Workforce

~400 jobs

Developer
Prime Data Centers
Trades
Electrician, HVAC Tech, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E, Cal/OSHA
Timeline
2025-2027

Prime Data Centers Sacramento campus. Ground broken Q2 2025. AI-ready with up to 40kW per rack air-cooled and 120kW+ per rack with liquid cooling.

GA

4 projects

Deployment site

Fairwater AI Superfactory

Fayetteville, GA

Completed

Capacity

200 MW

Workforce

~1,500 jobs

Developer
Microsoft
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2024-2025

Microsoft 'AI Superfactory' on QTS's 615-acre campus. 1M sq ft across 85 acres. Part of linked supercomputer with Wisconsin facility. Opened Nov 2025.

Deployment site

QTS West Marietta Street Campus

Atlanta, GA

Planning

Capacity

150 MW

Workforce

~1,200 jobs

Developer
QTS Data Centers
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2025-2028

$1.3B new data center campus on West Marietta Street in downtown Atlanta.

Deployment site

Stack Atlanta Campus

Lithia Springs, GA

Under Construction

Capacity

100 MW

Workforce

~800 jobs

Developer
Stack Infrastructure
Trades
Electrician, HVAC Tech, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2025-2027

Two data centers under development outside Atlanta in the Lithia Springs/Douglasville corridor, a key hub for Digital Realty, CoreSite, Switch, and Google.

Deployment site

Microsoft Atlanta AI Data Center

Atlanta, GA

Under Construction

Capacity

200 MW

Workforce

~1,500 jobs

Developer
Microsoft
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2025-2027

New Microsoft AI data center under construction, linked to Wisconsin facility as a 'massive supercomputer' with hundreds of thousands of Nvidia GPUs. Announced Nov 2025.

IL

4 projects

Deployment site

T5 Chicago III

Chicago, IL

Under Construction

Capacity

50 MW

Workforce

~400 jobs

Developer
T5 Data Centers
Trades
Electrician, HVAC Tech, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2024-2027

Broke ground Q4 2024, built by Clune Construction. Topped out May 2025. Expected live in 2027.

Deployment site

T5 @ Chicago IV

Libertyville, IL

Planning

Capacity

300 MW

Workforce

~2,000 jobs

Developer
T5 Data Centers
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, Ironworker, Heavy Equipment Operator, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2026-2032

Massive Lake County campus with up to 18-20 data center buildings. Could be the largest Lake County development. Construction estimated late 2025 or early 2026.

Deployment site

ORD01 Chicago

Chicago, IL

Under Construction

Capacity

20 MW

Workforce

~200 jobs

Developer
Colovore
Trades
Electrician, HVAC Tech, Cable Puller, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2025-2026

20 MW liquid-cooled data center. Construction began Fall 2025, expected ready for clients late 2026.

Deployment site

Project Steel

Aurora, IL

Under Construction

Capacity

100 MW

Workforce

~800 jobs

Developer
Prologis
Trades
Electrician, HVAC Tech, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2024-2026

Prologis Project Steel with 24 completed data center buildings in Aurora. Part of the suburban Chicago data center boom.

IN

2 projects

Deployment site

Google Fort Wayne Campus

Fort Wayne, IN

Under Construction

Capacity

200 MW

Workforce

~1,500 jobs

Developer
Google
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, Ironworker, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2024-2027

$2B campus on 700+ acres. Powers Google's global cloud and AI infrastructure. Built by Holder Construction. Broke ground April 2024.

Deployment site

Meta Jeffersonville Data Center

Jeffersonville, IN

Under Construction

Capacity

100 MW

Workforce

~800 jobs

Developer
Meta
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2024-2026

$800M facility, nearly 700,000 sq ft. Built by Turner Construction using prefabricated modular assemblies. 100% renewable energy, LEED gold. Construction began Jan 2024.

LA

1 project

Deployment site

Meta Monroe Campus

Monroe, LA

Under Construction

Capacity

400 MW

Workforce

~5,000 jobs

Developer
Meta
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, Ironworker, Concrete Finisher, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2024-2030

$10B nine-building, 4M sq ft campus — Meta's largest. 5,000+ peak construction workers. Built by Turner Construction, DPR Construction, and M.A. Mortenson. Construction started Dec 2024.

MO

2 projects

Deployment site

Project Mica (KC2)

Kansas City, MO

Under Construction

Capacity

250 MW

Workforce

~2,000 jobs

Developer
Google
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, Ironworker, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2025-2028

$10B second Google data center campus in Kansas City's Northland (Project Mica). NE of I-435 and US-169. Full energy costs covered by Google under Evergy agreement.

Deployment site

Golden Plains Park Data Center

Kansas City, MO

Under Construction

Capacity

150 MW

Workforce

~1,200 jobs

Developer
Meta
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2024-2026

$1B data center complex in northern Kansas City, Golden Plains Park. 1M sq ft. First AI-optimized data center set to open 2026.

MS

1 project

Deployment site

AWS Madison County Campus

Canton, MS

Under Construction

Capacity

300 MW

Workforce

~1,000 jobs

Developer
Amazon Web Services
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, Ironworker, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2025-2027

$10B two-building campus in Madison County, MS. 1,000 construction jobs. Built by Yates Construction, Gray Construction, and Haskell Construction. Expected completion 2027.

NV

4 projects

Deployment site

Vantage Reno Campus

Reno, NV

Under Construction

Capacity

100 MW

Workforce

~800 jobs

Developer
Vantage Data Centers
Trades
Electrician, HVAC Tech, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2025-2027

137-acre campus supporting next-gen GPU loads with liquid cooling. First facility scheduled to open Q2 2026.

Deployment site

Tahoe Reno Data Center

Sparks, NV

Under Construction

Capacity

60 MW

Workforce

~500 jobs

Developer
Novva Data Centers
Trades
Electrician, HVAC Tech, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2025-2026

60 MW facility at Tahoe Reno Industrial Center. 20-acre campus, 300,000 sq ft. Expected online 2026. Part of Novva's 1 GW buildout by 2028.

Deployment site

Tahoe Reno Industrial Center (TRIC) Expansion

Sparks, NV

Under Construction

Capacity

850 MW

Workforce

~5,000 jobs

Developer
Switch
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, Ironworker, Heavy Equipment Operator, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2020-2030

Massive campus at TRIC with full buildout exceeding 7M sq ft and 850 MW of power. Up to 17.4M sq ft planned. Ongoing phased construction.

Deployment site

Apex Industrial Park Campus

North Las Vegas, NV

Planning

Capacity

200 MW

Workforce

~1,500 jobs

Developer
Switch
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Heavy Equipment Operator, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2026-2029

Switch purchased 176 acres at Apex Industrial Park for $85.5M. NE of Las Vegas, adjacent to Highway 93. New hyperscale campus planned.

OH

5 projects

Deployment site

AWS New Albany Expansion

New Albany, OH

Under Construction

Capacity

300 MW

Workforce

~2,500 jobs

Developer
Amazon Web Services
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, Ironworker, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2025-2029

$3.5B expansion adding five data center buildings totaling 1.25M sq ft. Part of $7.8B total Ohio investment. 30-year tax abatement. Construction began 2025.

Deployment site

Prometheus Data Center

New Albany, OH

Under Construction

Capacity

150 MW

Workforce

~1,200 jobs

Developer
Meta
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2024-2026

Meta Prometheus campus in New Albany, wrapping up construction in 2026. Located on Beech Road.

Deployment site

Johnstown AI-Ready Campus

Johnstown, OH

Planning

Capacity

800 MW

Workforce

~5,000 jobs

Developer
Cologix
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, Ironworker, Heavy Equipment Operator, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2025-2032

AI-ready campus on 154 acres, 25 miles NE of Columbus. Eight data center facilities with 800 MW total capacity.

Deployment site

AWS Sunbury Data Center

Sunbury, OH

Under Construction

Capacity

200 MW

Workforce

~1,500 jobs

Developer
Amazon Web Services
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, Ironworker, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2025-2034

$2B data center under construction. Part of Amazon's $7.8B Ohio investment. Construction spans six years.

Deployment site

Ohio One Semiconductor Fab

New Albany, OH

Under Construction

Capacity

500 MW

Workforce

~7,000 jobs

Developer
Intel
Trades
Electrician, HVAC Tech, Pipefitter, Ironworker, Concrete Finisher, Heavy Equipment Operator, Sheet Metal Worker, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR, Confined Space, Fall Protection
Timeline
2022-2031

$100B semiconductor fab complex. $1.5B invested in construction in 2025 alone. Over 10.1M construction hours logged. Originally slated for 2026, now expected 2031. Largest private-sector construction project in Ohio history.

OR

4 projects

Deployment site

Hillsboro 5

Hillsboro, OR

Under Construction

Capacity

36 MW

Workforce

~300 jobs

Developer
Flexential
Trades
Electrician, HVAC Tech, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2024-2026

358,000 sq ft facility with 36 MW capacity. Flexential's fifth Hillsboro data center. Expected to boot up in 2026. Trans-Pacific digital hub.

Deployment site

Hillsboro 6

Hillsboro, OR

Planning

Capacity

40 MW

Workforce

~350 jobs

Developer
Flexential
Trades
Electrician, HVAC Tech, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2026-2028

Flexential's sixth Hillsboro data center. Land parcel acquired Sept 2025. Part of 330+ MW portfolio built or under development.

Deployment site

Hillsboro 1

Hillsboro, OR

Under Construction

Capacity

50 MW

Workforce

~400 jobs

Developer
QTS Data Centers
Trades
Electrician, HVAC Tech, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2024-2026

25-acre campus designed for rapid, large-scale hyperscale deployments. Multi-bay loading dock and flexible workspaces. Key Portland-area facility.

Deployment site

T5@Portland 4

Hillsboro, OR

Under Construction

Capacity

30 MW

Workforce

~250 jobs

Developer
T5 Data Centers
Trades
Electrician, HVAC Tech, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2024-2026

14th data center collaboration between T5 and Fortis Construction. Over 1M sq ft of construction delivered together in Hillsboro. 200,000 sq ft wholesale facility.

TX

6 projects

Deployment site

Stargate Campus

Abilene, TX

Under Construction

Capacity

4500 MW

Workforce

~10,000 jobs

Developer
OpenAI / Oracle / SoftBank
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, Ironworker, Concrete Finisher, Heavy Equipment Operator, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR, Confined Space
Timeline
2025-2029

$100B joint venture between OpenAI, SoftBank, and Oracle. 4.5 GW planned capacity. Ten 500,000 sq ft data centers. First facility under construction by Crusoe. Land owned by Lancium. Phased build over 4 years.

Deployment site

Frontier Campus

Albany, TX

Under Construction

Capacity

1400 MW

Workforce

~5,000 jobs

Developer
Vantage Data Centers
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Ironworker, Heavy Equipment Operator, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2025-2030

$25B AI campus on 1,200 acres in Shackelford County. 10 data centers totaling 3.7M sq ft. Ultra-high-density 250kW+ racks. First building delivery H2 2026. 5,000+ construction and operations jobs.

Deployment site

Provident-PowerHouse Hyperscale Campus

Fort Worth, TX

Under Construction

Capacity

200 MW

Workforce

~1,500 jobs

Developer
Provident / PowerHouse Data Centers
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2025-2028

200 MW hyperscale campus in DFW Metroplex. 24 buildings planned in three phases. First phase energized May 2026.

Deployment site

DFW04 Plano Campus

Plano, TX

Under Construction

Capacity

50 MW

Workforce

~400 jobs

Developer
Aligned Data Centers
Trades
Electrician, HVAC Tech, Cable Puller, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2025-2026

$161M facility spanning 425,500 sq ft at the existing Plano campus. Construction running Oct 2025 to Oct 2026.

Deployment site

Red Oak Campus

Red Oak, TX

Under Construction

Capacity

300 MW

Workforce

~2,000 jobs

Developer
QTS Data Centers
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, Ironworker, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2024-2027

Up to eight two-story data centers totaling 3.4M sq ft. Phase 1 includes four buildings. Construction underway since 2024.

Deployment site

Caldwell County Technology Park

Lockhart, TX

Planning

Capacity

2000 MW

Workforce

~8,000 jobs

Developer
Tract
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Ironworker, Heavy Equipment Operator, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2025-2035

2 GW technology park on 1,515 acres between Austin and San Antonio. Land acquisition completed May 2025. Initial 360 MW phase operational in 2028.

UT

3 projects

Deployment site

Eagle Mountain Data Center

Eagle Mountain, UT

Under Construction

Capacity

200 MW

Workforce

~1,500 jobs

Developer
Meta
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2019-2026

$1B+ campus expansion to nearly 4.5M sq ft. Multiple expansion phases adding 2M+ sq ft of new buildings. 100% renewable energy. LEED gold certification.

Deployment site

Novva West Jordan

West Jordan, UT

Under Construction

Capacity

72 MW

Workforce

~600 jobs

Developer
Novva Data Centers
Trades
Electrician, HVAC Tech, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2024-2026

318,000 sq ft data center with 72 MW IT load. $2B financing commitment. Expected fully complete by 2026.

Deployment site

Triple C Millard County Campus

Delta, UT

Under Construction

Capacity

500 MW

Workforce

~3,000 jobs

Developer
Joule Capital Partners / Triple C Farms
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Heavy Equipment Operator, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2025-2030

Potentially world's largest data center campus in Millard County, central Utah. Construction underway. First tenants expected 2026. Powered by fossil fuels initially.

VA

12 projects

Deployment site

VA1 Campus

Prince William County, VA

Under Construction

Capacity

900 MW

Workforce

~5,000 jobs

Developer
CleanArc Data Centers
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, Ironworker, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2025-2035

900 MW hyperscale campus on 87.5 acres. First 300 MW phase online Q1 2027, second 300 MW by 2030, third phase 2033-2035. Groundbreaking Q4 2025.

Deployment site

Stafford Technology Campus (STC)

Stafford, VA

Planning

Capacity

1000 MW

Workforce

~6,000 jobs

Developer
STACK Infrastructure
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Ironworker, Concrete Finisher, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2025-2030

1 GW campus on 500 acres with six 300 MW substations powered by Dominion Energy. Four sub-campuses. STACK purchased land for $302.3M in Jan 2025. First phase live by 2027.

Deployment site

Louisa County Campus

Louisa, VA

Announced

Capacity

1100 MW

Workforce

~5,500 jobs

Developer
EdgeCore Digital Infrastructure
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2026-2032

1.1 GW planned campus on 3.9M sq ft. Closed-loop air-cooled system. Power from Rappahannock Electric Cooperative. Announced June 2025.

Deployment site

STACK Ashburn Hyperscale

Ashburn, VA

Announced

Capacity

144 MW

Workforce

~1,200 jobs

Developer
STACK Infrastructure
Trades
Electrician, HVAC Tech, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2026-2028

144 MW hyperscale facility in Loudoun County with two 72 MW buildings. 1.31M sq ft total. Advanced closed-loop water cooling for AI/ML workloads. 100% renewable energy.

Deployment site

NVA-06 Leesburg

Leesburg, VA

Under Construction

Capacity

72 MW

Workforce

~600 jobs

Developer
STACK Infrastructure
Trades
Electrician, HVAC Tech, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2025-2027

72 MW data center on 52 acres in Loudoun County. Two phases: 48 MW building (Phase 1) and 24 MW building (Phase 2). AI-ready cooling. Power from NOVEC.

Deployment site

Gainesville Crossing Campus

Gainesville, VA

Under Construction

Capacity

325 MW

Workforce

~2,500 jobs

Developer
Corscale
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Ironworker, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2024-2027

Five-building 325 MW campus on 130 acres. Building 3 (54 MW) under construction with groundbreaking Feb 2025, topped out July 2025. Buildings 1-2 (72 MW each) nearing completion.

Deployment site

DataBank Ashburn

Ashburn, VA

Under Construction

Capacity

20 MW

Workforce

~200 jobs

Developer
DataBank
Trades
Electrician, HVAC Tech, Cable Puller, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2025-2026

20 MW facility in Ashburn, Data Center Alley. Expected online 2026.

Deployment site

Yondr Arcola

Arcola, VA

Under Construction

Capacity

48 MW

Workforce

~400 jobs

Developer
Yondr Group
Trades
Electrician, HVAC Tech, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2024-2026

48 MW facility in Loudoun County's Arcola area. Broke ground in 2024.

Deployment site

Google Chesterfield Data Center

Chesterfield, VA

Announced

Capacity

200 MW

Workforce

~1,500 jobs

Developer
Google
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2025-2028

Google data center campus in Chesterfield, VA. Construction expected to begin by end of 2025. Part of Google's Virginia expansion beyond Northern Virginia.

Deployment site

White Oak Technology Park 2

Sandston, VA

Planning

Capacity

400 MW

Workforce

~3,000 jobs

Developer
QTS Data Centers
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, Ironworker, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2025-2032

622-acre expansion adjacent to existing White Oak Technology Park. Could host 13+ data centers. QTS confirmed as customer for 620-acre campus outside Richmond.

Deployment site

Meta White Oak Campus

Sandston, VA

Under Construction

Capacity

150 MW

Workforce

~1,200 jobs

Developer
Meta
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2022-2026

Meta expansion at White Oak Technology Park in Henrico County. 475-acre site acquired for expansion (Project Tropical). Adjacent to QTS campus where subsea cables from Spain, Brazil, and France converge.

Deployment site

Iron Mountain Henrico

Henrico, VA

Planning

Capacity

50 MW

Workforce

~400 jobs

Developer
Iron Mountain
Trades
Electrician, HVAC Tech, Cable Puller, General Laborer
Certs
OSHA 30, NFPA 70E
Timeline
2025-2027

New Iron Mountain data center facility at White Oak Technology Park in Henrico County. Part of continued expansion of the 3,000-acre industrial park.

WI

1 project

Deployment site

Mount Pleasant Data Center

Mount Pleasant, WI

Under Construction

Capacity

300 MW

Workforce

~2,000 jobs

Developer
Microsoft
Trades
Electrician, HVAC Tech, Pipefitter, Cable Puller, Fiber Splicer, Ironworker, General Laborer
Certs
OSHA 30, NFPA 70E, First Aid/CPR
Timeline
2023-2026

$3.3B investment on 315 acres. First data center on Braun Road nearing completion, second breaking ground 2026. Zero-water evaporated cooling pilot. $13.3B total expansion proposed with two additional campuses.